Search History
Clear History
{{item.search_key}}
Hot Searches
Change
{{item.name}}
{{item.english_name}}
Subscribe eNews
Once A Week Once Every Two Weeks
{{sum}}
Login Register

Applications

R-Cycle unveils AI-based PPWR Compliance Compass at Interpack 2026

BASF expands compostable ecovio portfolio for flexible barrier packaging

Analysis for EU policy on bio-based plastic packaging under PPWR

Products

BASF expands HALS and NOR HALS capacities

Clariant launches new propane dehydrogenation catalyst

ENGEL to show integrated solutions for efficiency and precision at Interplas 2026

Activities

  • 350,000+ visitors! CHINAPLAS 2026 shatters every record in the book

  • CHINAPLAS 2026: 86,504 visitors explore innovations on Day 3

  • Must-attend events: Application in Focus and Additives Seminar

Pictorial

News Videos

Top 10 Technology Trends awards presented at CHINAPLAS 2026

MAAG x SIKORA: Smart pelletizing + precise inspection - More stable, carbon-reduced

CAI Machine: New visual inspection technology debut! More efficient, greener, colorful printing

Conference Videos

Interview: Thailand’s perspective on cross-border circular cooperation

Interview: On Indonesian recycling industry and rising geopolitical tensions

Interview: Vietnam’s progress in circular economy

Corporate/Product Videos

For Rubber & Plastic Extrusion Equipment, trust Hebei Zhongsen! Custom Extruders, Traction Machines & Vulcanizing Lines

Is Your Mold Supplier Really Giving You Peace of Mind?

Kurtz GmbH & Co.

Home > Watch it > News Videos

A 3D-printed house takes only 48 hours to build

Source:Prvok od Burinky Date:2020-07-02

The Czech Republic's first 3D-printed house, in the southern city of Ceske Budejovice, took only 48 hours to build and needs a few more weeks to dry. It has demonstrated the speed and effectiveness of a construction technique, that is claimed to be seven times faster and half the cost of building a brick house.

 

With three rooms and a floor area of 463 sq ft, the Prvok od Burinky home was built layer-by-layer using a robot arm repurposed from the automotive industry. 


1_web.jpg

The 3D-printed house is built on a floating pontoon.


This arm deposited a specially formulated concrete, which was co-developed by Master Builders Solutions (BASF), with nano-polypropylene fibers, plasticizers and setting accelerators mixed in, at a rate of 15 cm per second. Walls were printed with inner and outer layers, and the middle presumably was filled with insulating material.

 

According to the company, this concrete set to standard house foundation hardness within 24 hours, and after 28 days it will complete its hardening to the point where it's as strong as a bridge. The structure and materials are designed to hold up for 100 years.


2_web.jpg

The house is equipped with recirculating shower.


This demonstration house is built on a floating pontoon, with a wooden deck around it. Moving inside, it's a fairly small living space for two, with a bedroom, living room/kitchen and a bathroom.

 

It is also equipped with the requisite eco-tech including recirculating shower, green roof, and reservoirs for drinking, utility and sewage water. This kind of structure will create up to 20% less CO2 than an equivalent brick building.

The Czech Republic's first 3D-printed house, in the southern city of Ceske Budejovice, took only 48 hours to build and needs a few more weeks to dry. It has demonstrated the speed and effectiveness of a construction technique, that is claimed to be seven times faster and half the cost of building a brick house.

 

With three rooms and a floor area of 463 sq ft, the Prvok od Burinky home was built layer-by-layer using a robot arm repurposed from the automotive industry. 


1_web.jpg

The 3D-printed house is built on a floating pontoon.


This arm deposited a specially formulated concrete, which was co-developed by Master Builders Solutions (BASF), with nano-polypropylene fibers, plasticizers and setting accelerators mixed in, at a rate of 15 cm per second. Walls were printed with inner and outer layers, and the middle presumably was filled with insulating material.

 

According to the company, this concrete set to standard house foundation hardness within 24 hours, and after 28 days it will complete its hardening to the point where it's as strong as a bridge. The structure and materials are designed to hold up for 100 years.


2_web.jpg

The house is equipped with recirculating shower.


This demonstration house is built on a floating pontoon, with a wooden deck around it. Moving inside, it's a fairly small living space for two, with a bedroom, living room/kitchen and a bathroom.

 

It is also equipped with the requisite eco-tech including recirculating shower, green roof, and reservoirs for drinking, utility and sewage water. This kind of structure will create up to 20% less CO2 than an equivalent brick building.

全文内容需要订阅后才能阅读哦~
立即订阅
Construction
BASF
 OQ Marketing (Shanghai) Co., Ltd.
Deluxe Member
 ZHANGJIAGANG CITY FARCREATIVE PLASTIC MACHINERY CO., LTD
Elite Member
 Taizhou Huangyan Zhengwei Mould Co.,Ltd
Classic Member
 GUANGDONG INTEAM NEW MATERIALS TECHNOLOGY CO., LTD.
Classic Member
 HEBEI GELIA PLASTIC MACHINERY SALES COMPANY
Classic Member
 WENZHOU DETAI PLASTICS CO., LTD
Elite Member

Leave Comment

Submit

All Comments

No Comment

{{VueShowUserOrCompany(itme.user)}}

{{ toolTimes(itme.updated_at,'s') }}

{{itme.body}}

Reply   
Submit
{{VueShowUserOrCompany(itmes.user)}} {{ toolTimes(itmes.updated_at,'s') }} Reply

{{itmes.body}}

Submit

You May Also Like

More>

08:18

Interview: Thailand’s perspective on cross-border circular cooperation

2026-05-08

08:10

Interview: On Indonesian recycling industry and rising geopolitical tensions

2026-05-08

06:28

Interview: Vietnam’s progress in circular economy

2026-05-08

01:54

Top 10 Technology Trends awards presented at CHINAPLAS 2026

2026-05-07

03:48

Brückner presents new member and debut of NoSho technology at CHINAPLAS 2026

2026-04-01

You May Be Interested In

Change

  • People
  • Company
No Content
{{[item.truename,item.truename_english][lang]}} {{[item.company_name,item.company_name_english][lang]}} {{[item.job_name,item.name_english][lang]}}
{{[item.company_name,item.company_name_english][lang]}} Company Name    {{[item.display_name,item.display_name_english][lang]}}  

  • Hot Tags

    More>

Polyurethane Investment Medical Carbon neutral Reduce cost and increase efficiency CHINAPLAS Financial reports rPET INEOS Styrolution Evonik Borouge Polystyrene (PS) mono-material Sustainability Circular economy BASF SABIC Multi-component injection molding machine All-electric injection molding machine Thermoforming machine
Improve the information
Hey there! Fill out your info to keep watching!
To give you a better experience, please share some details with us!
Of course All are OK No I have read and agree to the 《Terms of Use》 and 《Privacy Policy》
Continue Watching See Other Sessions

A 3D-printed house takes only 48 hours to build

识别右侧二维码,进入阅读全文
下载
x 关闭
订阅
亲爱的用户,请填写一下信息
I have read and agree to the 《Terms of Use》 and 《Privacy Policy》
立即订阅
Top
Feedback
Chat
News
Market News
Applications
Products
Video
In Pictures
Specials
Activities
eBook
Front Line
Plastics Applications
Chemicals and Raw Material
Processing Technologies
Products
Injection
Extrusion
Auxiliary
Blow Molding
Mold
Hot Runner
Screw
Applications
Packaging
Automotive
Medical
Recycling
E&E
LED
Construction
Others
Events
Conference
Webinar
CHINAPLAS
CPS+ eMarketplace
Official Publications
CPS eNews
Media Kit
Social Media
Facebook
Linkedin